Research building S11, Ghent

The location of project S11 is in line with the strong urban design principles of Ghent University’s master plan: reinforcement of definition and rhythm on ‘De Pintelaan’, alternation of green and paved spaces, architectural cohesion with the adjacent buildings and structuring of the fordable green structure of the campus. The main building, “the machine” will have a compact, rational beam shape of five storeys high. The addressing is clear, the new project is read as an independent institute.

The entrance is clearly readable and is directly accessible from the covered entrance square with stairs (and ramp) on the street side. The beam shape of the main building is perpendicular to ‘De Pintelaan’ – limiting the width. At right angles to the main building, a transparent and inviting plinth in a freer form is foreseen on the ground floor on ‘De Pintelaan’. This will accommodate all receptive public functions: reception, cafeteria and meeting rooms.

The green inner area of ​​the campus, with its grassland, pioneer forest, the commons and wadi keep the campus together as an entity. It is therefore self-evident that the new building also focuses and opens up to the heart of the campus. The area between building S9 and the new building S11 will have a mainly logistic function.

location
Ghent
client
Ghent University
programme
offices, labs, foyer, cafetaria, entrance hall
surface
9.400 m2
year
2019 — ...
status
in progress
architect
evr-architecten
contributors
Brecht Van Slycke, Alison Merlant, Sara Vandewalle
stability
Arcadis
techniques
Arcadis