Howest Campus, Bruges

The Design and Build-team, with MBG as building contractor, in cooperation with evr-architecten, INBO, Arcadis and Omgeving are developing the ‘Howest Campus Brugge Station’ as a ‘Living Campus’, a healthy and inspiring environment where you learn to discover your motivations and get the best out of yourself. The assignment involves the restructuring of the Campus, partly through the addition of a large new classroom building on a connecting plinth, and partly through the renovation and reorganization of the existing buildings on the Campus.

The design intertwines the characteristics of the existing buildings and the surroundings with new additions. The existing buildings undergo thorough restructuring. A major intervention involves incorporating the former pedestal, formerly used as an indoor parking, into spaces for the school. Here, shared, and multipurpose spaces are created: a library, reception area, a renewed cafeteria, DIY workshops, etc. Since the old buildings were originally offices and were not suitable as school buildings due to undersized evacuation routes, the integration of new staircases is the second major intervention in the existing campus buildings. The new classroom building aligns in color and material with the existing structures but simultaneously gives Howest Campus a new expressive face towards the train station and the city center of Bruges. Through its appearance, the new volume reflects the importance that the school places on innovation and sustainability.

The new classroom building sits on a plinth that connects to the existing buildings. Parking is provided underneath the plinth, while the most dynamic functions are located on top of the plinth, forming the vibrant heart of the campus. The plinth is also designed to accommodate the future construction of an additional classroom building on top. Wide public stairs make the plinth accessible from ground level. Buildings and landscape become a continuation of informal spaces where student interactions naturally occur. Special attention is given to the landscape, featuring a marsh pond and forest, centrally located in the campus.

 

location
Bruges
client
Howest
programme
redevelopment campus for higher and secondary education
year
2019 — 2024
status
completed
architect
evr-architecten, Inbo
contributors
Manu Heytens, Joris Ghyssaert, Seppe Heyde, Julie Pont, Judith Haanen, Mathieu Verougstraete, Gabriele Matuzeviciute, Elena Bacis
landscape architecture
Omgeving
stability
Arcadis
techniques
Arcadis